|
Immediate Stabilization and Function / Polyceramic Material Fused to Metal: Extraction, Placement and Restoration of Four Mandibular Incisors with Two Immediately Functioning Implants and a four-unit polyceramic material to metal fixed prosthesis |
||
|
||
![]() |
1. | Pre-operative radiograph. |
![]() |
2. | Pre-operative site. |
![]() |
3. | Extraction of failed endodontically treated tooth. |
![]() |
4. | Extraction of failed endodontically treated tooth. |
![]() |
5. | Soft tissue being removed from the five walls of the extraction sockets. |
![]() |
6. | Osteotomy being prepared with 2.0mm pilot bur rotating at 1100RPM with external irrigation. |
![]() |
7. | Parallel pin confirming appropriate trajectory and acting as a guide for subsequent osteotomy. |
![]() |
8. | Latch reamer extension being used to facilitate the use of the pilot bur close to the adjacent canine tooth. |
![]() |
9. | Parallel pins seated in their pilot osteotomies indicating their trajectories. |
![]() |
10. | A 2.0mm guidepin being inserted into the pilot osteotomy to accommodate using a sulcus reamer as a planisher to level the crestal bone around the pilot osteotomy. |
![]() |
11. | Sulcus reamer being inserted onto the guide pin. |
![]() |
12. | Sulcus reamer being used to level the bone heights around the pilot osteotomy, since uneven levels may cause inadvertent displacement of the reamer burs. |
![]() |
13. | Osteotomy being enlarged with an olive green 2.5mm latch reamer bur rotating at 50RPM without water irrigation. |
![]() |
14. | Depth gauge confirming the appropriateness of the prepared osteotomy |
![]() |
15. | 3.5mm x 11.0mm HA coated implant with a 2.0mm implant well is being inserted with the black polyethylene healing plug. |
![]() |
16. | 3.5mm x 11.0mm HA coated implant being inserted into the osteotomy with the implant inserter/retriever device. |
![]() |
17. | Implant seating tip attached to a straight handle is being tapped to seat implant farther into the osteotomy. |
![]() |
18. | Post-insertion radiograph. |
![]() |
19. | Primer agent being applied. |
![]() |
20. | A 4.0mm x 3.5mm Stealth Shouldered Abutment with a 2.0mm Post being inserted into the well of the implant. |
![]() |
21. | . Short acrylic sleeve being snapped on to stealth abutment. |
![]() |
22. | Bonding primer agent being applied. |
![]() |
23. | Bonding agent being applied. |
![]() |
24. | Light curing of bonding agent. |
![]() |
25. | Polyceramic material being added to an acrylic sleeve to form a strut. |
![]() |
26. | Vacuum-formed template placed over the strut material is being light cured. |
![]() |
27. | Vacuum-formed template placed over the strut material is being light cured. |
![]() |
28. | Material is being added to facilitate the aesthetic contouring of the strut. |
![]() |
29. | Material is being added to facilitate the aesthetic contouring of the strut. |
![]() |
30. | Prosthesis prior to final polishing. |
![]() |
31. | Transitional prosthesis being removed for polishing. |
![]() |
32. | Bonding agent being applied. |
![]() |
33. | Additional Light curing of bonding agent. |
![]() |
34. | Polyceramic material is being contoured around the acrylic sleeve. |
![]() |
35. | Transitional prosthesis being snapped onto non-shouldered abutments. |
![]() |
36. | Light curing of additional material. |
![]() |
37. | View of bonded transitional prosthesis. |
![]() |
38. | Radiograph of integrated implants sixteen weeks after implant placement. |
![]() |
39. | View of transitional prosthesis prior to its removal sixteen weeks after implant placement. |
![]() |
40. | View of transitional abutments after removal of splinted prosthesis. |
![]() |
41. | View of implant wells after the removal of the transitional prosthesis and the stealth abutments. |
![]() |
42. | Red 2.0mm impression reamer being inserted onto guide pin to remove any tissue which might inhibit the complete seating of an impression post. |
![]() |
43. | Red 2.0mm plastic impression post being inserted into the 2.0mm well of an integrated implant for the making of an implant level transfer impression. |
![]() |
44. | Red plastic impression post receiving its mandatory seating tap. |
![]() |
45. | Impression material being injected around the impression posts for the making of a full arch implant level transfer impression. |
![]() |
46. | Digital image being taken of shade guide against a black plastic background to facilitate the fabrication of an aesthetic Integrated Abutment Crown™. |
![]() |
47. | Transitional prosthesis re-inserted after the making of an implant level impression. |
![]() |
48. | Two milled abutments in red plastic implant analogs in stone model. |
![]() |
49. | Two piece cast metal framework joined with red acrylic resin prior to an intra-oral confirmation of its appropriateness. |
![]() |
50. | View of two transitional abutments prior to their being removed during patient’s third clinical visit. |
![]() |
51. | View of implant wells after the removal of the transitional prosthesis and the stealth abutments. |
![]() |
52. | Metal framework being used to orient milled abutments into the wells of their implants. |
![]() |
53. | Metal framework being removed from the initially seated milled abutments. |
![]() |
54. | Milled abutment being tapped into its implant well. |
![]() |
55. | Milled abutment being tapped into its implant well. |
![]() |
56. | Separated metal framework being tapped onto milled abutments. |
![]() |
57. | Separated framework being reattached with red acrylic. |
![]() |
58. | Impression material being injected around metal framework for the making of a transfer impression. |
![]() |
59. | New master model with the removed milled abutments and metal implant analogs to facilitate the soldering of the framework. |
![]() |
60. | Prosthesis on stone model. |
![]() |
61. | View of four-unit poly-ceramic material to metal prosthesis. |
![]() |
62. | View of transitional prosthesis on patient’s fourth clinical visit. |
![]() |
63. | View of two transitional abutments prior to their being removed during patient’s fourth clinical visit. |
![]() |
64. | Stealth abutment being removed. |
![]() |
65. | View of implant wells after the removal of the transitional prosthesis and the stealth abutments. |
![]() |
66. | Milled abutment being inserted into prosthesis. |
![]() |
67. | Prosthesis being used to orient the milled abutment into its implant well. |
![]() |
68. | Prosthesis being tapped to initially engage the first milled abutment into its implant well. |
![]() |
69. | Prosthesis being removed. |
![]() |
70. | Post of milled abutment being cleaned with an alcohol wipe to remove any contaminants. |
![]() |
71. | Second milled abutment being inserted into the well of its implant. |
![]() |
72. | Prosthesis being tapped to initially engage the second milled abutment into its implant well. |
![]() |
73. | Prosthesis being removed. |
![]() |
74. | Milled abutment being definitively tapped to engage its locking taper connection. |
![]() |
75. | Milled abutment being definitively tapped to engage its locking taper connection. |
![]() |
76. | Prosthesis being reseated. |
![]() |
77. | Reseated prosthesis. |
![]() |
78. | Separating medium being applied to facilitate removal of extraneous cement. |
![]() |
79. | Minimal cement being added only to the cervical area of casting. |
![]() |
80. | Prosthesis being cemented onto laboratory milled abutments. |
![]() |
81. | View of cemented prosthesis. |
![]() |
82. | View of prosthesis four-weeks post-insertion. |
|
||